亚洲AⅤ天堂AV天堂无码,97SE色综合一区二区二区,亚洲精品成人午夜在线,欧美久久久久久蜜桃,人妻少妇偷人精品一区,欧美日韩在线一区二区,国产一区二区精品网站看黄,亚洲欧美日韩中文高清WWW777

        News

        Drilling of Hilong’s Comprehensive Technical Service Well Rajani-5 Starts

        Date 2016-03-23

        (March 23, 2016, Shanghai) Hilong Oil Service & Engineering Pakistan (Private) Ltd. successfully started an integrated service project to drill well Rajani-5 on March 21, 2016, with drilling fluid, directional drilling and bits services.
         

        The designed TD of Rajani-5 is over 14000ft, estimated bottom hole temperature(BHT) is as high as 170℃, the highest mud weight is as high as 14ppg. It is a rare deep and high-temperature well in Rajani block, giving extreme difficulty to drill.
         

        Hilong introduced UEPL with customized solutions of drilling fluid, directional drilling and bits in the 2nd half of 2015. After a number of technical exchanges and business trip to Hilong, UEPL released PO to Hilong to provide integrated service of well Rajani-5.

         

        Dai Daliang, senior vice president of Hilong Group and general manager of Oil Service Business said, “the Rajani-5 well is the first oversea integrated oil service project of Hilong, marking a big step forward on the part of Hilong towards becoming an integrated oil service supplier.”

        The Site of the Rajani-5 Well